Embedded Product Configuration Management Platform

Many units have more or less problems in the process of configuration management of software development. The current problems include:

♦ Software configuration management relies on manual completion. There is no professional configuration management tool to centrally and uniformly manage software in the control system development process.

♦ Even if you purchase configuration management software, it is difficult to use, resulting in waste of resources.

♦ Lack of formal software change processes, no requirements changes, design changes, defect handling processes and forms

♦ The configuration management system is not perfect or even basically has no software configuration management system.

♦ Difficulties in data reuse between projects, confusion of versions, and even loss of data due to lack of effective configuration management

solution

The entire configuration management system architecture of Hengrun Technology is based on IBM Rational ClearCase and ClearQuest, and then based on CMMI and the customer's existing configuration management system to develop a configuration management solution.

In the early stage of the project, the R&D data of the control system is stored in a certain repository of ClearCase. We refer to the data storage area before the project data is finalized as the development library.

When the data (design, code, test cases) developed by the developer reaches a certain stable state (such as the completion of basic function development, the first round of test pass, etc.) and passes the corresponding test and review, the data is transferred to controlled The library performs relatively strict management and marks the data version (baseline) of the inbound on the controlled library.

Embedded Product Configuration Management Platform


If you make changes to the data in the controlled library, you need to extract the data into a special change library, and then need to submit the corresponding change request according to different types of changes (design changes, software bugs, demand changes). After the change is completed, the changed content of the test is returned to the controlled library.

When the project can be delivered to production, we can submit the project data from the controlled library to the product library. The product library can be stored in ClearCase, or the final executable file can be submitted to the PDM system as a normal zero. Parts are treated.

Embedded Product Configuration Management Platform


Valentine's Day

Perfect For Any Home & Perfect Gift: Our Valentine's Day Decoration , you can easily place it at anywhere throughout your home, on the living room, bedroom, gallery, etc. In a word, in any home you can always find a perfect place to put it. Therefor this Valentine's Day Decoration is a perfect gift, especially as Housewarming Gift.

Valentine's Day,Beding Storage Box,Waterproof Coating Storage,Tall Storage Bins,Black Storage Bins

HISMOK(SHENZHEN)TECHNOLOGY CO.,LTD , https://www.willtrademat.com

Posted on