1 The ground must be smooth and free of dust, sand and other debris.
2 The material will be opened for a period of time before installation, and then the materials will be laid out in order according to the site. During the process of the shop, the materials cannot be dragged and the hard objects cannot be used.
3 Open the adjacent two pieces of plastic tape with the manufacturer's matching tape on the two pieces of plastic under the adjoining, in order to glue the two pieces of glue to compact the gap.
4 The foamed ground floor glue needs to be welded with the manufacturer's welding wire.
Rotating Curling Iron,2 In 1 Auto Hair Curler,Usb Rechargeable Curling Iron,Hair Curler Automatic Magic
Ningbo Chuangxiang Electrical Appliance Co.,Ltd , https://www.hshaircurler.com